Process plants, clean rooms and manufacturing lines, where the mechanical design and the production rate are the same conversation.

Selected industrial work

Square footages are as recorded at the time of design.

Cutaway illustration of a hazardous gas neutralization system inside a facility

CS Clean Solutions

Danbury, CT · Approximately 9,000 sq. ft.

CS Clean Solutions neutralizes hazardous waste for the semiconductor manufacturing industry. We provided the mechanical, electrical and plumbing design.

Technician in sterile gown, mask and gloves at work in a clean room

NE Scientific

Waterbury, CT · Approximately 15,000 sq. ft.

NE Scientific reprocesses medical devices. We provided mechanical, electrical, plumbing and process improvement design for the Waterbury plant.

The work included clean room manufacturing areas.

Diagram of the CS Clean Solutions service and column refill model

CS Clean Solutions

Phoenix, AZ · Approximately 13,000 sq. ft.

We were glad to help CS Clean Solutions open their Phoenix location, which serves large chip manufacturers including TSMC and Intel.

Chiller plant interior with pumps, headers and large diameter piping

80 Ton Centrifugal Chiller

Mechanical design for an 80 ton centrifugal chiller at an industrial manufacturer.

  • Load calculations
  • Distribution piping
  • Pumps
  • Piping
  • VFD's
Baghouse dust collector unit with collection drums beneath the hoppers

Dust Collection Systems

Dust collection design for industrial clients.

  • 25,000 CFM total exhaust
  • Duct distribution system
  • Local capture design
Water being poured into a glass

Water Resources Savings

We reviewed process water requirements for one client and cut consumption by 1,000,000 gallons per year, worth hundreds of thousands of dollars.

  • Updated maintenance plan
  • Heat exchangers installed
  • Flow monitors
  • Process modifications
Glowing investment casting shells on a foundry floor

Production Increase

Production rose 300 percent for an international investment casting manufacturer.

  • Optimized process layout
  • Increased reliability
  • Addressed quality issues
  • Applied engineering fundamentals
Overhead bus duct runs above electrical equipment at an industrial site

Process Electrical Distribution

480V three phase bus duct distribution design for process equipment.

  • Transformers
  • Bus duct
  • Bus plugs
  • Wire sizes
  • Process design